H-Energy is setting up a land-based LNG Terminal on 38 acres of land at Kukrahati in the state of West Bengal. The capacity of the terminal is initially 3 MMTPA and shall be expanded to 5 MMTPA in later years. The terminal will have storage tanks with a total capacity of 180,000 m3. Along with this, it will also have two dedicated LNG jetties for berthing and unloading small LNG vessels. Additionally, we are also coming up with truck loading bays for supplying LNG using Cryogenic Road Tankers to those customers who are not connected by gas pipelines. We have already been awarded the Petroleum and Natural Gas Regulatory Board (PNGRB) authorization for the natural gas pipeline which will connect the LNG terminal to the customers in West Bengal and Western Bangladesh. The project is scheduled to be commissioned by 2023.
Regulatory Documents:-
• Six monthly EC compliance report for Digha LNG Terminal (April 2020 to Sep 2020) • Six monthly EC compliance report for Kukrahati LNG Terminal (April 2020 to Sep 2020) • Six monthly EC compliance report for Kukrahati LNG Terminal (Nov 2019 to Mar 2020) • EC for Kukrahati LNG Terminal dated 6-11-2019
Project Updates
Studies and Status
• Met-ocean Modeling • Techno-Commercial Feasibility Study • Market Assessment Report • Site Selection Study • Mooring Analysis Uptime Assessment High Level Sloshing Analysis • Pre-Engineering Survey for Pipeline (Phase1) • EIA Study • Sloshing Analysis • Studies on the Clearances required for Project • Met-ocean Study based on real-time data • Geotechnical Survey (Offshore) • Geotechnical Survey (Onshore) • Front End Engineering & Design– Subsea Pipeline & ORF • Technical Specification for FSRU
Major milestones achieved
Other Projects
Kakinada
H-Energy is developing an FSU based LNG re-gasification project in Andhra Pradesh on the Eastern Coast of India which will serve as a major natural gas supply source for the state of Andhra Pradesh and neighboring states. It will also serve as most preferred source for gas based power plant.
Jaigarh
Western Concessions Private Limited (formerly known as H-Energy Gateway Private Limited), a wholly owned subsidiary of H-Energy is on advanced stage to commission India’s first FSRU (Floating Storage and Re-Gasification Unit) based LNG terminal project at Jaigarh Port, in Ratnagiri district of Maharashtra.
Natural Gas Pipeline Project
H-Energy is executing 635 km Jaigarh-Mangalore natural gas pipeline project on the West coast of India for which it has received authorization from Petroleum and Natural Gas Regulatory Board (PNGRB). The pipeline will connect to the demand centres in the coastal towns/cities of Ratnagiri, Sindhudurg, Goa, Karwar, Udupi and Mangalore.
H-Energy Private Limited
Western Concessions Private Limited
HE Marketing Private Limited
H-Energy East Coast Private Limited
HE Terminals Private Limited
info@henergy.com
- Disclaimer
- Privacy & Policy
- Terms & Conditions
Corporate Office
12th Floor, Knowledge Park,
Hiranandani Business Park,
Powai, Mumbai - 400 076, India.
T: +91 22 2571 5100
F: +91 22 2576 3777
Registered Office
514, Dalamal Towers, 211 FPJ Marg,
Nariman Point, Mumbai – 400 021,
India
T: +91 22 2287 6060
F: +91 22 2283 2010